Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 9, 2020

April 20, 2020

January 15, 2021

2990 College Dr

Addition, Renovation, Site Work

No Information to Display

$1,897,000.00

Public - State/Provincial

img_map_placeholder

2990 College Dr, Saint Augustine Beach, FL

Subscribe to View Full Documents

The project's primary scope of work includes a 5,685 gsf addition to the St. Augustine Campus existing Building V, a 7,510 gsf / 6880 nsf Student Activity Center. A generous 270 days for contract time is scheduled for completion within one/single phase. Base Bid-Addition: generally includes site work (building prep/misc demolition, relocated potable water), minor renovation work (new access openings, new wall, and replace carpet two rooms with LVT), and the addition/new construction consisting of: steel beams/joists/deck, supported on architectural (CMU with moisture barrier stucco exterior) and interior column; concrete slab; barrel-tile on sloped roof over main floor area; modified bitumen on low roof section; stud gyp bd walls; storefront wall and entry systems, wood doors, and steel doors, and hardware incl access control; misc cabinetry; HVAC equipment installation (owner furnished) and associated duct work; and Electrical (lighting systems/equipment/security/FA). Bid Alternate 1-Flooring and Painting (renovation within the existing building), scope includes new LVT in most of the spaces & misc Carpet, as well as Painting (along w/ associated demo). Bid Alternate 2-Ceiling Work with associated Painting (renovation within the existing building), scope includes miscellaneous ceiling grid adjustment with above grid painting at those locations. Bid Alternate 3-Millwork (renovation within the existing building) includes display cabinets, counters, and enhancements for three column accents. Contract time to Substantial Completion for Base Bid Work is 270 Calendar Days. M/WBE participation is encouraged.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects