Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 27, 2023

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

$247,910.00

Public - City

img_map_placeholder

To Be Determined, Johnston, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

https://www.cityofjohnston.com/DocumentCenter/View/8065/CIP_Public_Hearing_Complete_010421 Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25% Urbandale) SCHEDULING AND PROJECT STATUS; 18-19 Design 19-20 ROW Acquisition/Utility Relocation 20-21 Construction ($2,470,910 - Johnston, $1,116,775 - Urbandale) RELATIONSHIP TO COMPREHENSIVE PLAN AND OTHER PROJECTS: Consistent with Comprehensive Plan Project is included City of Johnston FY 2021-2025 Page 46 _______________________________________________________________________________________________________________________ https://www.cityofjohnston.com/DocumentCenter/View/8065/CIP_Public_Hearing_Complete_010421 Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25% Urbandale) SCHEDULING AND PROJECT STATUS; 18-19 Design 19-20 ROW Acquisition/Utility Relocation 20-21 Construction ($2,470,910 - Johnston, $1,116,775 - Urbandale) RELATIONSHIP TO COMPREHENSIVE PLAN AND OTHER PROJECTS: Consistent with Comprehensive Plan PID - # 21-Road-009 Project is included City of Johnston Falls FY 2021- 2026 CIP Page 46 _______________________________________________________________________________________________________________________ www.cityofjohnston.com/DocumentCenter/View/7609/Section-4---Capital-Improvement-Plan-CIP Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25%Urbandale) Project is included City of Johnston FY 2020/2021 -2023/2024 CIP Page 22 ___________________________________________________________________________________________________________________________________________________________________________ www.cityofjohnston.com/DocumentCenter/View/7609/Section-4---Capital-Improvement-Plan-CIP Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25%Urbandale) Project is included City of Johnston FY 2020/2021 -2023/2024 CIP Page 22 ________________________________________________________________________________________________________________________________ Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25%Urbandale) Project is Included City of Johnston FY 2020/2021 -2024/2025 CIP. As of May 1, 2020, a design team and a general contractor have been selected. Construction is anticipated to begin in 2020. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.