Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 19, 2022

July 7, 2023

No Information to Display

1615 Stanley St

Addition, Demolition, Renovation, Site Work

No Information to Display

$12,575,200.00

Public - State/Provincial

img_map_placeholder

1615 Stanley St, New Britain, CT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

*As of February 14, 2023, an award has not yet been made. The project will probably be “official” within the next couple of weeks. **  Project BI-RC-406 Burritt Library Renovation/Addition (Library Annex) Central CT State University 90 Harold Lewis Drive New Britain, CT Construction Costs: Greater Than $500,000 Bidding Limited To: Contractors Prequalified by DAS for General Building Construction (Group B) Threshold Limits: (C.G.S. 29-276b & 20-341gg) This Project DOES NOT exceed Threshold Limits. Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 12,214,055. To $ 13,499,745. Contract Time Allowed: Calendar Days: 425 Liquidated Damages: $ 2,697 Per Calendar Day Beyond Substantial Completion. $ 2,307 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the DAS/CS Project Manager listed below. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects