Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 9, 2023

June 30, 2026

SR-6011

Demolition, New Construction, Paving, Site Work

No Information to Display

$20,000,000.00

Public - State/Provincial

img_map_placeholder

SR-6011, Olyphant, PA

Subscribe to View Full Documents

FEDERAL PROJECT #T042-524-M0E1 For the Improvement of a Certain Section of State Highway in Lackawanna County, City of Scranton, Commonwealth of Pennsylvania, State Route 6011 Section 251. This Project is Situated as Follows: From a Point Approximately 0.7 Miles West of the Sr 3025 Intersection on Sr 6011 at Segment 0270 Offset 0757 (Station 1008+50) to a Point Approximately 1.7 Miles South of Interstate 81 on Sr 6011 Segment 0280 Offset 0300 (Station 16+50) With a Total Work Area Length of 1321 Feet (0.25 Miles). The Project Involves the Replacement of an Existing Two-span Structure Carrying Sr 6011 Over the Lackawanna River. The Existing Span 1 Includes Steel Plate Girders, and the Existing Span 2 Includes Adjacent Box Beams. The Proposed Structure Will Be a Single Span Composite Stell Plate Girder Bridge With 2 Travel Lanes, 1 Center Turn Lane, Shoulders, and Sidewalks. Approach Work Includes Full Depth Pavement Reconstruction, Curb and Sidewalk Replacement, Signal Work at Ross Avenue, Construction of an Access Road From Diamond Ave to the Existing Western Abutment, Full Depth Reconstruction on Nay Aug Avenue, and Mill and Overlay at the Sr 6011 and Main Avenue Intersection. Traffic Control Will Be Maintained With a 2 Lane Temporary Road and Bridge Over the Lackawanna River and Temporary Signal at Ross Avenue and Main Avenue. Project Cost Range: $15,000,000.00 - $19,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 53.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 6011 Green Ridge Street over Lackawanna River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.