Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 16, 2021

March 1, 2022

Leibel Rd. and 1st St.

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Leibel Rd. and 1st St., Cincinnati, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project will provide resources for the construction of 9,600 feet of 8-inch to 15-inch diameter sewer and the elimination of five pump stations. The project is located between Leibel Road and 1st Street in Green Township in Hamilton County, Ohio. The purpose of this project is to eliminate five existing pump stations through construction of a new sanitary sewer. During design, it was determined the new gravity sewer will connect to the existing sanitary system near Fiddler's Green. Given the topography and existing structures and infrastructure, the new gravity line will be constructed using trenchless technology to minimize the impact to area residents and businesses. This project will provide service to unsewered areas and reduce annual operations and maintenance costs resulting from the pump stations. This project is being coordinated with other active projects planned for the Muddy Creek sewershed. As of May 2021, a new CIP was issued, this project is currently in the FY 2021-2025 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2021. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2021. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.