Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 8, 2023

July 24, 2023

May 15, 2025

PA-590

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,244,444.00

Public - State/Provincial

img_map_placeholder

PA-590, Greeley, PA

Subscribe to View Full Documents

For the Improvement of a Certain Section of State Route 0590, Sec 401 in Pike County, Lackawaxen Township. The Location of the Project is as Follows: From a Point on Sr 0590 at Segment 0120 Offset 0672 (Sta 283+50) to a Point Approximately 328 Feet Along Sr 0590 at Segment 0130 Offset 0201 (Sta 290+50) and From a Point on Sr 0590 at Segment 0130 Offset 0601 (Sta 294+50) to a Point Approximately 355 Feet Along Sr 0590 at Segment 0130 Offset 1101 (Sta 299+50), With a Total Work Area Length of 682.75 Feet (0.129 Miles). The West Culvert Consists of a 64"X36" Squashed Cmp Culvert With Stone Headwalls and Wingwalls. The Existing Structure Will Be Replaced With a 72" Corrugated Metal Pipe Culvert With Precast Concrete Endwalls. The Approach Roadway Work Will Extend Approximately 165 to the South and 115 to the North of the Pipe. Traffic Will Be Maintained via an Approved Three (3) Day Roadway Closure and Detour. The East Culvert Consists of Three (3) 36" Diameter Cmp Culverts Carrying Sr 0590 Over West Falls Creek With Stone Headwalls. The Existing Structure Will Be Replaced With a 12-0 X 3-6 Single Cell Precast Concrete Box Culvert With Precast Concrete End Sections. The Approach Roadway Work Will Extend Approximately 75 to the West and 120 to the East of the Culvert. Traffic Will Be Maintained via an Approved Seven (7) Day Roadway Closure and Detour. Other Work Includes Excavation, Full Depth Bituminous Paving, E & S Control Measures, Drainage, Guiderail, Landscaping, Temporary Traffic Control, Signing, Pavement Markings, Culvert Removal, and Other Miscellaneous Construction Work. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 33.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement PennDOT - SR 590 Pipes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects