Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 28, 2023

June 4, 2024

PA-715

Demolition, New Construction, Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

PA-715, Tannersville, PA

Subscribe to View Full Documents

As of July 31, 2023, the project has been awarded. A timeline for construction has not ben confirmed. This Project is for the Replacement of an Existing Two-span Stone Masonry Arch Structure Over Mcmichael Creek With a Single Span Contech Engineered Solutions Con/span Arch Culvert, Drainage System Improvements, and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 0715, Section 03b, in Monroe County, Chestnuthill Township From Approximately 100 Feet West of the Intersection of Sr 0715 and Hypsie Gap Road at Segment 0100 Offset 2723 to Approximately 200 Feet West of the Intersection of Sr 0715 and Swift Road at Segment 0110 Offset 0259. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 32.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 715 over McMichael's Creek II *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects