Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 26, 2023

March 13, 2023

June 13, 2024

PA 309

Demolition, New Construction, Paving, Site Work

No Information to Display

$718,035.00

Public - State/Provincial

img_map_placeholder

PA 309, Mountain Top, PA

Subscribe to View Full Documents

For the improvement of a certain section of STATE ROUTE 309, Sec D56 in LUZERNE COUNTY, DALLAS TOWNSHIP. The location of the project is as follows: From a point approximately 0.59 miles North of the intersection with SR 415 at Segment 0770 Offset 1165 to a point approximately 0.79 miles North of the intersection with SR 415 at Segment 0770 Offset 2205 along SR 309, Dallas Township. The proposed structure rehabilitation work includes: Reinforced Concrete Repair Type 2 inside the existing box culvert; excavation of the existing box culvert to remove and replace the top slab and the headwall for the last five feet at culvert outlet; removal of portions of the existing wingwalls at the culvert outlet; construction of a reinforced concrete cast-in-place end section at the culvert outlet; placement of waterproofing membrane on top of the existing/ proposed top slab of the box culvert; epoxy injection crack sealing; clearing and grubbing of the existing roadway embankment above the headwall to remove trees and vegetation; channel clearing of all debris and vegetation to restore free flow; and placement of intrusion grout bags, Class C Cement Concrete, and Selected Borrow Excavation Rock, Class R-6 to fill an existing scour hole and prevent further erosion and undermining of the structure. Construction will be completed using half-width staging to maintain traffic and temporary construction easements will be required at all four corners of the bridge. The traffic control during construction will be staged half width construction. All work contained within an overall length of 940 linear feet (0.178 miles) as indicated on the approved drawings included in the bid package. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 28.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE RECONSTRUCTION 408 Version: 2020-5 PennDOT - PA 309 over Br Fern Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects