Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 1, 2025

December 30, 2023

December 30, 2026

Hester St

Site Work

No Information to Display

$100,000,000.00

Public - State/Provincial

img_map_placeholder

Hester St, New York, NY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Hester Street Substation: Renewal of the underground Hester Street Substation serving the IND 6th Avenue Line (B/D) in the Borough of Manhattan. Work includes: Removal of existing traction power and installation of new traction power, including switchgears, transformers, rectifiers, DC breakers, and other systems. Installation of new property line manhole and ducts for high- and low-tension cabling, and removal and installation of new ducts for Consolidated Edison ("Con Edison"). Furnishing and installation of positive and negative cables, control cables, battery cables, and others, from Substation to Circuit Breaker Houses (CBH), Fan plants, and third rail. Replacement of Remote Terminal Unit ("RTU") with Programmable Logic Cabinet ("PLC") and Digital Input and Output Cabinet ("DIO") for substation's SCADA. Performance of related work, including mechanical, electrical, and architectural and structural elements. Village Substation: Renewal of the underground Village Substation serving the IND 6th Avenue Line (IND) in the Borough of Manhattan. Work includes: Removal of existing traction power and installation of new traction power, including switchgears, transformers, rectifiers, DC breakers, and other systems. "Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid." Relocation of Con Edison conduits, installation of new ducts, installation of new property line box, and expansion of existing heating and ventilation shafts. Furnishing and installation of new Cable Termination Boxes (CTB) at Fan Plants and other locations and connections from these CTBs to Village Substation's CTB. Furnishing and installation of positive and negative cables, control cables, battery cables, and others, from Substation to Circuit Breaker Houses ("CBH"), Fan plants, and third rail. Replacement of Remote Terminal Unit ("RTU") with Programmable Logic Cabinet ("PLC") and Digital Input and Output Cabinet ("DIO") for substation's SCADA. Performance of related work, including mechanical, electrical, and architectural and structural elements. This is a A+B Contract Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 22.5% Contract term: Maximum 1096 days Substantial Completion

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects