Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

October 31, 2024

October 31, 2025

Kirk Rd & Pine St

Renovation

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

Kirk Rd & Pine St, Batavia, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Dorm 4 in the Village needs updating, below are the proposed upgrades. - Replace the existing decrepit drop ceiling with a drywall ceiling matching the rest of the dorm. - New Attic Hatches to be installed in the main hallways where the old rusty existing ones are. - New LED Fixtures to be installed throughout the dorm. - New (Fermilab supplied) Carpet Tiles will replace throughout where the old existing carpet is located. - Vinyl Plank Flooring to be installed at the Front Door Entrance, Kitchen, Dining Room, and Bathrooms. - Interior Walls, Ceilings and Kitchen Cabinets will be painted. (Walls to be Light French Grey, Ceiling to be White and Cabinets to get painted a Darker Grey). - Bathrooms to have FRP installed on ceiling and walls to mitigate excess moisture. - Bathrooms to receive new Toilets, Vanities, Mirrors, Tub/Shower Enclosure, Faucets and LED Fan/Light Combo. - Kitchen to receive new Laminate Countertops, new Stainless Steel Kitchen Sink and new double handle Faucet with side sprayer. - Exterior Lighting to be updated to LED Fixtures throughout. - New Exterior Doors to be installed WITHOUT storm doors at the entrance/exit locations. (3) in total. SITE LOCATION The Subcontractor shall confine all operations (including storage of materials) on Fermilab premises to areas authorized or approved by FRA. The Subcontractor shall hold and save FRA and the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Subcontractor's performance. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois. Du Page County. Dorm #4 in the Village. FRA will return RFIs to the Subcontractor within 10 calendar days of receipt. RFIs received after 12:00 noon shall be considered received on the next regular workday for the purpose of establishing the start of the 10-calendar day response period. EST START DATE: 10/31/2024 EST END DATE: 10/31/2025

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.