Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

November 25, 2024

No Information to Display

165 Duckworth St

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

165 Duckworth St, St. John's, NL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Closing time: 02:00PM Question Acceptance Deadline Oct 11, 2024 2:00PM Pricing Lump sum The project will entail the full replacement of the existing Building Automation System which shall provide DDC control for all the main HVAC systems and all the zone level controls. The scope of work includes: 1. Replace existing digital BAS that controls central systems including all control boards and electronic sensors. 2. Replace all existing pneumatic devices such as damper actuators and valve actuators with electric/electronic devices. 3. Replace all zone level pneumatic controls including terminal unit controllers, thermostats, etc. with electronic controllers, thermostats, sensors, etc. 4. Run new local network wiring to all zone level, supervisory level, and master level controllers and other networked devices. 5. Provide new graphical interface to new BAS with user level access through an owner supplied Cradlepoint router. 6. Retain services of balancing contractor to calibrate air terminal units and air flow station. 7. Phase work to allow existing BAS system or parts thereof to remain fully operational until new system or parts thereof is operational. 8. Provide installation/static and functional testing commissioning services, integrated life safety testing, and operator training as indicated in the specifications and commissioning plan. 9. Provide project closeout documentation including O&M manuals, as-built drawings, and equipment data forms as indicated. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects