Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

February 28, 2025

Multiple Locations

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Brampton, ON

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Gore Meadows - Remove existing counters and install one permanent counter and ensure accessibility standards are met. A door will be added behind counter area and fitness access will be reconfigured. Cassie Campbell - Remove existing counter and install larger counter to accommodate 2 staff and ensure accessibility standards are met. A staff door will be added to access the space. It is anticipated to be completed by February 28, 2025. Documents can be obtained at: https://brampton.bidsandtenders.ca Question Deadline: Thu Oct 10, 2024 2:00:00 PM (EDT)

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.