Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

November 22, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Kahoka, MO

Our team is requesting plans for this project.

Subscribe to View Full Documents

The proposed work includes: Sidewalk improvements along West Main Street from North Morgan Street heading East approximately 290 LF and turning North along North Johnson Street approximately 310 LF turning West along West Commercial Street approximately 140 LF terminating at the alley midway back to North Morgan Street. The Proposal shall be accompanied by a certified or cashier's check drawn on a solvent Missouri bank or trust company made payable to the City of Kahoka or a Bid Bond issued by a surety licensed to conduct business in the state of Missouri and appearing on the U.S. Treasury Department's most current list (Circular 570, as amended), in the amount of not less than five percent (5%) of the total bid. The Bid Bond may be retained by the City of Kahoka, as a guaranty that if the Proposal is accepted, the bidder will execute the Contract and file an acceptable Performance Bond and Payment Bond within fifteen (15) days after the award of the Contract. The Contractor doing the work must pay for labor at rates not less than those certified pursuant to Section 290.210-.340, RSMo. (1986) by the Missouri Department of Labor and Industrial Relations as indicated by the schedule included in the Contract Documents. In accordance with Section 102.2 of the Missouri Standard Specifications for Highway Construction, a prime contractor must have a fully responsive contractor questionnaire on file with the Missouri Highways and Transportation Commission (MHTC) at least seven (7) days prior to the bid opening date. The limitation in Sec 108.1.1 of the Missouri Standard Specifications for Highway Construction that "the contractor's organization shall perform work amounting to not less than 40 percent of the total contract cost" is waived for this contract. Instead, the less restrictive terms of the Federal Highway Administration's rule at Title 23 Code of Federal Regulations (CFR) 635.116(a) shall apply, so that the contractor must perform project work with its own organization equal to and not less than 30 percent of the total original contract price. All other provisions in Sec 108.1.1 et seq. of the Missouri Standard Specifications for Highway Construction shall remain in full force and effect, and shall continue to govern the contractor and its subcontractors, in accordance with the provisions of Title 23 CFR 635.116. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest responsive, responsible bidder. Said lowest Bidders shall be determined for each Contract by summarizing the applicable low base bids. Contractors and sub-contractors who sign a contract to work on public works projects must provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The contract DBE goal for the amount of work to be awarded is 0% of the total federal project price. No 2nd Tier Subcontracting will be allowed on this project. The City of Kahoka reserves the right to reject any and all bids and to waive all informalities in the bids. No bids may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids. MODOT - Downtown Sidwalk Project

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.