Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2024

December 2, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$30,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Northville, MI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Department of Technology Management and Budget and in partnering with the Michigan State Police is seeking proposals to update the fire alarm systems at the two locations noted above. Northville is approximately 43,000 SF and Oak Park 16,000 SF. Attendees can page through existing drawings available at the time of the visit. Drawings will not be posted. Another location at northern Michigan to be added after the construction completion of these 2 locations. The added location is not part of this scope. Both locations to be part of one bid package. Phases included are 100 through 700. The RFP calls for reviews and deliverables at 50% and 90% of phases 100 through 500. This number of reviews and deliverables is excessive, and it is not required. The Phases and deliverables can be combined to yield 35%, 75%, 90% and 100%, bidding. Set aside some time to assemble closing documents. Fire Alarm Panel Replacements 2 locations: 1. Michigan State Police - Northville Forensic Laboratory 2. Michigan State Police - Metro North (Oak Park) Project Address (if applicable) 1. 42145 W 7-Mile Road, Northville, MI 481670 - Meeting here first. 2. 14350 10 Mile Road, Oak Park MI 48237 Design meetings: 1. Kickoff 2. 35% 3. 75% 4. 90% 5. 100% Construction Progress meeting to convene every 2 weeks. Meeting's location: During design one site meeting at each location and then all other design meeting to be via Microsoft Teams. Please email the Design and Construction Contract Specialists if you are having issues. Please include your ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov). You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Approved emailed submissions MUST be received prior to bid deadline to be considered responsive and responsible. Question Deadline 10/21/2024 at 2:00 PM ET Please do not submit online questions via electronically.. ALL questions should be emailed to Chris Bahjet at BahjetC@Michigan.gov.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects