Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

November 25, 2024

No Information to Display

Main St

Paving, Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

Main St, Warsaw, MO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The proposed work for Project A, designed by LePage Engineering generally includes the following: Grading and Embankment, a Concrete Bike Lane, Street Lighting, Sidewalks, Asphaltic Pavement Widening, Aggregate Base, Curb and Gutter, Curbing, Storm Sewers, Box Culvert Extension, Driveways Pavement Markings, Seed and Mulch and Signage. The project is located along the north side of Main Street, extending from west of Hackberry Street to Gunstock Drive and is approximately 1,552 feet in length. Questions about Project A should be directed to LePage Engineering. The proposed work for Project B, designed by Own Engineering generally includes the following: Construction of 5 wide concrete sidewalk and 4 wide concrete bike lane, access connections, culverts, and any incidental work related thereto, including street improvements within the project area in accordance with the plans and specifications. The project is generally located along the north side of Main Street between Illinois Street and Hackberry Street and between Gunstock Drive Walnut Drive. The length of the improvements is approximately 1,100 feet of sidewalk and 2,300 feet of bike lane. Questions about Project B should be directed to OWN Engineering. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening Each bidder shall file with his bid a bidder's bond in the amount of 5 percent of the contract price as indicated per the contract documents. The bidder to whom a contract is awarded will be required to furnish a performance bond and a payment bond on the forms provided, payable to the City of Warsaw, and in the amount of 100 percent of the contract price in conformity with the requirements of the General Conditions. DBE's will be 0%. The City of Warsaw, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest. MODOT - Main Street Complete Street Improvements and Main St. Non Motorized Street Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.