Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 2, 2025

No Information to Display

Centennial Way & Huntington Dr

Site Work

No Information to Display

$960,000.00

Public - City

img_map_placeholder

Centennial Way & Huntington Dr, Arcadia, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Huntington Drive and Centennial Way - Eastbound and Westbound Intersections El Monte Avenue and Duarte Road/Campus Drive Intersections Currently, the Huntington Drive/Centennial Way intersections are two-way stop-controlled. This project is intended to signalize the intersections of Westbound Huntington Drive & Centennial Way and Eastbound Huntington Drive & Centennial Way. The work will include, but is not limited to, installation of new traffic signal poles, mast arms, signal heads, pedestrian heads, pedestrian push buttons, conduit, conductors, fiber optic cable, cabinets, vehicle detection, CCTV, and additional intelligent traffic signal equipment. In addition to the Centennial Way intersections meeting traffic signal warrants, traffic signal warrants for the intersections of El Monte Avenue & Campus Drive and El Monte Avenue & Duarte Road were performed. The study confirmed that signalization was warranted at both intersections. The work will include, but is not limited to, installation of new traffic signal poles, mast arms, signal heads, pedestrian heads, pedestrian push buttons, conduit, conductors, fiber optic cable, cabinets, vehicle detection, CCTV, and additional intelligent traffic signal equipment. The project is included in the City of Arcadia's FY 2024-2029 Capital Improvement Program (CIP). As of September 24, 2024, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.