Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 7, 2024

December 17, 2024

Keys Rd

Paving, Site Work

No Information to Display

$25,000.00

Public - State/Provincial

img_map_placeholder

Keys Rd, Elma, WA

4

11

Subscribe to View Full Documents

Provide all labor, materials, equipment, and permits to asphalt pave and accessible parking pad and walkway, including striping and signage, at the Department's Fuller Bridge Access, located at Keys Road, Elma, Washington 98541, GPS coordinates 46.979336, -123.478444, in Grays Harbor County. For information or technical questions regarding this project, email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line If the project is estimated at or above one million dollars, a mandatory 15 percent Apprentice labor hours of the total labor hours are a requirement of this contract. The Apprenticeship Utilization Requirements are identified in Section 00100 Instructions Minority and Women's Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers. For bids of $35,000 or less, no bid guarantee is required. Bids greater than $35,000 shall be accompanied by a certified check, cashier's check, or bid bond payable to the Washington Department of Fish and Wildlife in an amount equal to at least five-percent of the bid as evidence of good faith and as a guarantee that, if awarded the Contract, the bidder will execute the Contract and give separate bond as required, see Section 00702.06. For Base Bids of $150,000 or less, Owner may at Contractor Request, retain 10% of the amount of each progress payment, in lieu of payment and performance bonds Substantial Completion shall be achieved by December 6, 2024. Final Completion shall be achieved by December 17, 2024.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.