Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2024

February 25, 2025

June 30, 2025

611 Oak St

Renovation

No Information to Display

$430,000.00

Public - City

img_map_placeholder

611 Oak St, Salida, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000363782 Question Deadline 10/14/2024 at 4:00 PM MT Questions are submitted online Yes, All questions and final bids must be submitted via online. The purpose of this Request for Proposal is to identify and select a solar team to be a partner in the design and installation of a photovoltaic system for the new Salida Fire Station in Salida, Colorado at 611 Oak Street Salida, CO. The owner's objective is to complete a photovoltaic system on the new Salida Fire Station. The City of Salida has a passion for sustainability and understands the benefits of renewable energy. We want to work with a company that shares the same passion and goals. The City of Salida has received grant funding from DOLA (Renewable and Clean Energy Initiative (HB 21-1253) (RNSS)) and will be contributing City funding for the installation of a photovoltaic system for the new Salida Fire Station. The new fire station is slated for construction completion by mid- December 2024. The City of Salida will hire a qualified contractor to install solar panels and associated equipment at the new under-construction fire station, located at 611 Oak Street in the City of Salida, Colorado. Work includes purchase and installation of approximately two hundred seventy-two (272) 590-watt solar panels, one hundred thirty-eight (138) power optimizers, one (1) inverter, and a 160 kilowatt (kW) remote energy monitoring system. The project must be code compliant and have AC connection to the grid. The project must be completed by 6/30/2025. Company must aid in Interconnection Agreement with Xcel energy to receive rebates and connect to the grid. The company must also assist in applying for the Direct Payment incentive from the IRS governmental agencies of 40% of the project cost if we are eligible. The City of Salida reserves the right to reject any and all proposals, to waive any informalities or minor irregularities in proposals, and to accept the proposal deemed, in the opinion of the City, to be in the best interest of the City.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects