Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

June 24, 2025

No Information to Display

175 W Mark St

New Construction, Site Work

No Information to Display

$40,000,000.00

Public - State/Provincial

img_map_placeholder

175 W Mark St, Winona, MN

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The purpose of the RFQ is to evaluate and select a group of qualified Construction Managers to shortlist for RFP and interview for the role of Construction Manager at risk (CM@r). Winona State University (WSU) is designing and building the Center for Interdisciplinary Collaboration, Engagement & Learning (CICEL) to replace the severely outdated Gildemeister and Watkins Halls with a new 73,000 square-foot building and over an acre of greenspace that results from the reduced building footprint. Project is currently funded for design. The project has ambitious regenerative design goals and intends to receive the International Living Future Institute's Living Building Challenge 4.0 Core Green Building Certification and Zero Energy Certification. It will forward WSU's commitment to sustainability, resilience, well-being, and equity and access. Users from all backgrounds, cultures, and abilities will feel comfortable and welcome. The design will promote health and well-being through daylighting, high-quality ventilation, elimination of harmful products and materials, and a focus on user comfort and satisfaction. The project is sited within a compact urban campus which will be in full operation during building construction. Demolition and construction will be staged to allow full operation of Watkins Hall until the new building is occupied. The project intends to seek grants, utility rebates, and Elective Pay Credits through the Federal Inflation Reduction Act (IRA) and will seek assistance from the CM@r. Pre-Qualification: Yes **Pre-bid meeting: Parking passes will be provided to park in campus lots. All firms interested in this meeting should contact James Goblirsch to confirm attendance. All potential or interested Responders must attend the meeting. Respondents who do not attend this meeting will not be considered.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects