Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

November 6, 2024

No Information to Display

250 South St

Remodeling

No Information to Display

$300,000.00

Public - County

img_map_placeholder

250 South St, Lawrence, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Bathroom Remodel - Van Buren Tech Bathroom Remodel (five) Scope of Work The VAN BUREN INTERMEDIATE SCHOOL DISTRICT is soliciting competitive bids to remodel five bathrooms located at Van Buren Tech, 250 South Street, Lawrence, MI 49064. The company is responsible for all measurements and other details of this proposal. Response to this request for proposal is indication that the vendor has checked all aspects of this request. The awarded bidder must comply with the applicable Federal, State, and local safety requirements. Prior to initiation of services, the awarded bidder shall provide a copy of their written safety program, which shall include health, safety, and environmental quality for review. The Van Buren Intermediate School District reserves the right to accept or reject any or all bids, to waive irregularities which it deems to be in the best interest of Van Buren Intermediate School District, and the right to award the contract to other than lowest bidder. Specifications Our preference in material is listed below, but we will accept products that are of equivalent quality. Equivalent or greater warranty is required. Demolition Main Office Removal and disposal of existing tile (floor and walls) Removal and disposal of toilets, urinals, sinks, faucets, supply water lines, countertops, and waste water plumbing up to the wall termination. Clean up of all debris from demo work performed. A102 and Two small restrooms Removal and disposal of existing tile (floor and walls) Removal and disposal of sinks, faucets, toilets, waste water plumbing up to the wall termination, and countertops. Clean up of all debris from demo work performed. Installation Main office - men (1) and women's (1) bathrooms Tile floor and walls Floor tile 12"x24" Ceramic tile (Color TBD) Ditra Uncoupling membrane Cove Base To match floor Schluter All Set Gray Grout Tec 25lb Schleter - Dilex AHKA Brushed Chrome 3/8" Wall Tile Collection 4"x12" (Daltile EL40, EL43 and EL44 to match current bathrooms), white grout Plumbing Auto flush valves Sloan Valve for urinals and toilets Touchless faucets Kohler Toilets Kohler - Kingston K-4325 Urinals Kohler Sinks 48" Ceramic trough with 2 faucets (1 each, men's and women's), new supply line connections reconnect waste water plumbing in accordance with ADA requirements A102 ADA Bathroom (1) Tile floor and walls Floor tile 12"x24" Ceramic tile (Color TBD) Ditra Uncoupling membrane Cove Base To match floor Schluter All Set Gray Grout Tec 25lb Schleter - Dilex AHKA Brushed Chrome 3/8" Wall Tile Collection 4"x16" 3 (Daltile EL40, EL43 and EL44 to match current bathrooms), white grout Plumbing Auto flush valves Sloan Valve for toilet Touchless faucets Kohler 13463 Toilets Kohler - Kingston K-4325 Sinks 24" Ceramic trough with 1 faucet, new supply line connections, reconnect waste water plumbing in accordance with ADA requirements Small bathrooms (2) hall B - teacher's lounge Tile floor and walls Floor tile 12"x24" Ceramic (Color TBD) Ditra Uncoupling membrane Cove Base To match floor Schluter All Set Gray Grout Tec 25lb Schleter - Dilex AHKA Brushed Chrome 3/8" Wall Tile Collection 4"x12" 3 (Daltile EL40, EL43 and EL44 to match current areas), white grout Plumbing Auto flush valves Sloan Valve for toilets Touchless faucets Kohler 13463 Toilets Kohler wall mounted Sinks 24" Ceramic trough with 1 faucet, new supply line connections, reconnect waste water plumbing in accordance with ADA requirements The awarded bidder shall give all necessary notices, obtain all permits, and pay all government sales taxes, fees, and other costs. The awarded bidder will file all necessary plans, prepare all documents, and obtain all necessary approvals of all governmental departments having jurisdiction, obtain all required certificates of inspection of work, and deliver same to the Van Buren Intermediate School District before acceptance and final payment of work if needed. Work must be completed during the time frame as follows: A102 and two small restrooms (teacher's lounge), during Holiday Break (12/23/2024- 1/3/2025 Main office restrooms, 6/16/2025-6/30/2025)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects