Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 10, 2025

No Information to Display

Bellevue Rd

Paving, Site Work

No Information to Display

$2,150,000.00

Public - City

img_map_placeholder

Bellevue Rd, Atwater, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The City of Atwater, in partnership with the County of Merced ("County"), initiated a Project Study ReportProject Development Support ("PSR-PDS") to evaluate improvements to Bellevue Road, a major collector road alignment, that would help relieve congestion and improve traffic flow through the City along Bellevue Road. The Project will reduce Vehicle Miles Traveled ("VMT") while restoring Bellevue Road as a major entry to the northern portion of the City, providing a more direct route between State Route 99, the City, and the Castle Commerce Center to the east. Bellevue Road would be realigned just south of the existing Bellevue Road, then conform near the intersection of Parade Street and Bellevue Road within the City corporate limits. New intersection connections are required at Vine Avenue and Orchard Park Avenue. The PSR-PDS identified two (2) alignment alternatives; however, in discussions with Project stakeholders a third viable alternative alignment emerged between these two. All three alignments were evaluated in the adopted Initial Study and Mitigated Negative Declaration. The City Council adopted the Alignment Alternative 3 as the preferred alignment. The adopted PSR-PDS is included as Attachment D to this RFP; the adopted IS/MND is included as Attachment E; the adopted Alignment Alternative No. 3 is included as Attachment F; and the adopted Bellevue Road Cross Section is included as Attachment G. Owner is soliciting proposals from qualified firms for professional engineering design services to complete Scope of Work for the PS&E Phase for the realignment and reconstruction of Bellevue Road complete, including traffic signals. City is pursuing an aggressive schedule with completion of PS&E anticipated no later than 06/30/2025. Deadline for Questions September 25, 2024 by 5:00 PM PDT This phase of the Project is funded by Merced County Measure V Regional Projects Funds, which is a local 30-year, half-cent ($0.005) sales tax measure passed by voters in November 2016 and administered by the Merced County Association of Governments ("MCAG"). A funding agreement is in place between City and MCAG for $2,150,000 for this phase of the Project. Owner reserves to itself (at its sole discretion) all rights available to it under applicable law, including without limitation, with or without cause, and with or without notice, the right to Reject any or all Proposals. The Proposal must not exceed 40 total pages (most or all 8 1/2 x 11 inches with 1-inch or greater margins), excluding the transmittal letter, index or table of contents, front and back covers, title pages/separation tabs, and appendices. A maximum of ten of the total pages may be 11 x 17-inch tri-fold format. Elevenpoint font or larger must be used in Proposal Parts 1 - 6.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.