Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

April 1, 2025

July 1, 2025

150 N Division St

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

150 N Division St, Auburn, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Casey Park Boiler Replacement Project In accordance with Executive Law, Article 15-A, the City of Auburn encourages proposals from minority and women-owned business enterprises as defined under Subdivision 9 of Section 310 of said law. All selected applicants will be required to provide an equal opportunity policy and staffing plan. The City reserves the right to reject any and all bids, waiver any informalities, or award the contract in the best interest of the City of Auburn. Any questions relative to this bid shall be directed by email to Theresa Adams, Assistant Comptroller at tadams@auburnny.gov. Questions must be received by Wednesday, October 2,2024 The scope of work shall be as outlined herein, and shall be performed in accordance with all applicable 2020 New York State Codes and Standards along with equipment and material specifications. The successful Contractor shall provide all properly sized equipment, materials, labor and incidentals to perform the following work: 1. Disassemble, remove and dispose of existing Weil McLain boiler, Lochinvar hot water heater, and A.O. Smith storage tank. Disassemble, remove and dispose of limited air supply and return piping, natural gas piping, and flue vent piping along with any other demolition necessary to complete the project. Flush system thoroughly. No ACM is visible on the piping attached to the exisiting boiler. Pictures of current boiler are attached in Attachment A. 2. Furnish and install (2) new Burnham 807H Gas Knockdown Boilers (or approved equal) to replace the existing Weil McLain unit along with 1 new Tekmar TEK261 boiler control (or approved equal), (2) new Taco TAC0012F-4 circulator pumps (or approved equal), (1) new Spirovent air eliminator VVSR300MT (or approved equal) and (1) new Amtrol AMTSX-60V expansion tank (or approved equal). Provide all supply and return piping, boiler drains, natural gas piping, outside air vent piping for combustion air intake using existing chimney, boiler flue vent piping, isolation ball valves and/or other electrical and plumbing tie-ins necessary to meet manufacturers specifications and instructions. Furnish and install (8) Navien NAVNPE-240A2 tankless water heaters (or approved equal) with recirculation valves, 30014367B dampers, (8) Isolation Purge valves, (1) new timer/control for existing circulator pump. All supply and return piping, boiler drains, natural gas piping, outside air vent piping for combustion air intake using existing chimney, boiler flue vent piping, isolation valves, and/or other electrical and plumbing tie-ins to meet manufacturers specifications and instructions.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.