Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

November 22, 2024

No Information to Display

1901 Pennsylvania Ave

Site Work

No Information to Display

$10,000.00

Public - State/Provincial

img_map_placeholder

1901 Pennsylvania Ave, Saint Louis, MO

11

21

3

Subscribe to View Full Documents

The project includes inner perimeter fence improvements for Hawthorn Children's Psychiatric Hospital that includes the removal and replacement of existing inner perimeter fence, manway access gate, vehicle access gate, concrete foundations, removal of an existing manway access gate, contract utility locate service to locate existing onsite private utilities to protect said existing onsite private utilities from damage during construction, temporary site security fence to secure inner perimeter courtyard during fence removal and replacement, erosion control / storm water pollution prevention, landscape / finish grading, seeding and fertilizing, all appurtenances and minor details necessary to make the completed improvements fully operational with the project plans and specifications. Replace Inner Perimeter Fence, Administration Building Hawthorn Childrens Psychiatric Hospital St. Louis MBE/WBE/SDVE Goals: MBE 0%, WBE 0%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. POINT OF CONTACT: A. Designer: Hurst-Rosche, Inc., Zach York, (636) 333-3351, email: zyork@hurst-rosche.com B. Project Manager: Lorena Villalobos, (573) 751-3565, email: Lorena.Villalobos@oa.mo.gov The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. Doc Notes: Refunds: Return plans and specifications in unmarked condition within 15 working days of bid opening to American Document Solutions, 1400 Forum Blvd., Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433. Deposits for plans not returned within 15 working days shall be forfeited. Prime contractors will be allowed a maximum of two bid sets at the deposit rate shown above. Other requesters will be allowed only one bid set at this rate. Additional bid sets or parts thereof may be obtained by any bidder at the cost of printing and shipping by request to American Document Solutions at the address shown above. Bidder must secure at least one bid set to become a planholder

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects