Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 24, 2025

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Avery, ID

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

East Fork Ninemile Creek Waste Consolidation Area - Phase 3 Final Cover Project. Scope The work will involve installation of the final cover system of the EFNM WCA to isolate previously place mine waste from the basin. The majority of the work will be located in steep and remote mountainous terrain. Activities include, but are not limited to, the following: Access road maintenance. Erosion control best management practice (BMP) installation and maintenance. Clearing, grubbing, and log and root wad salvage and stockpiling. Drainage control features (i.e., channels, benches, swales) installation. Quarry development (and closure), which includes blasting and processing blasted rock to create specific construction materials. Development and implementation of an Environmental Protection Plan with activities that include: stormwater management, decontamination procedures, site winterization, and housekeeping. Installation of 3 layer liner system consisting of a Geotextile, textured Geomembrane, and Geocomposite Drainage layers. Installation of liner cover system consisting of 1-inch minus material, salvaged soil and lime-amended cover soil. Amend final cover system with Proganics BSM and Richlawn Fertilizer Installation of quarry access road. Permanent seed on the final cover system. Performing quantity and as-built surveys. Implementing a robust quality assurance project plan for certifying materials generated in the quarry are clean. Preparing as-build record drawings, and preparing documentation and reporting to meet the Coeur d'Alene Trust and the EPA requirements.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.