Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

April 15, 2025

No Information to Display

Multiple Locations

Addition, Demolition, Renovation, Site Work

No Information to Display

$10,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Berkley, MI

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Description Additions & Renovations at Berkley High School & Cana Church This Bid Package will consist of separate sealed bids for the following Bid Divisions: 101: Earthwork & Site Utilities 102: Asphalt Paving & Site Concrete 103: Selective Demolition 104: Concrete Footings & Foundations 105: Interior Concrete Flatwork 106: Masonry 107: Steel 108: Carpentry & General Trades 109: Roofing / Sheetmetal 112: Caulking 114: Aluminum Storefront; Entrances; Glass & Glazing 115: Metal Studs/Drywall/Acoustical Treatment 116: Hard Tile 118: Resilient Flooring 120: Painting 125: Toilet Compartments & Accessories 128: Manufactured Casework & Music Storage 130: Window Treatments 133: Pool Equipment 134A: Theatre & Stage Rigging 134B: Theatre Seating 140: Plumbing 141: Fire Protection 142: HVAC 143: Electrical 149: Fencing All Bids must be accompanied by a Bid Security, in either the form of a bid bond or certified bank check, in the amount of five (5) percent of the amount of the Bid, payable to Berkley Schools, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or failure of the Bidder to enter a Contract for performance, Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing. If awarded a contract, the successful bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the contract price. Berkley Schools reserves the right to reject any or all bids received, to waive any informalities and irregularities in the bidding, and to accept a bid other than the lowest bid. Although a firm timeline has not been confirmed, construction is not expected to start prior to Spring 2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.