Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2024

July 7, 2025

No Information to Display

Multiple Locations

Demolition, New Construction, Site Work

No Information to Display

$21,000,000.00

Public - County

img_map_placeholder

Multiple Locations, West Palm Beach, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The respondents will be submitting proposals to provide Construction Management at Risk services consisting of pre-construction services, developing a Guaranteed Maximum Price (GMP), and construction of the following project Fire Station (FS) #25, located at 1060 Wellington Trace Wellington, FL 33414 and FS #33 located at 830 Kirk Rd., West Palm Beach, FL 33406 (the Project). The Project includes, but is not limited to: For FS #25 - the demolition and construction of an approximately 6,500 square foot of living area, renew the existing apparatus bay area and renew and reconfigure the existing site improvements. For FS #33 - the demolition of the existing fire station in its entirety and the construction of an approximately 15,600 square foot Fire Station and renew and reconfigure the existing site improvements. The two referenced Fire Station projects are to include all associated site work, utilities, paving, drainage, site lighting, signalization infrastructure, landscape, irrigation, and removal of temporary facilities and restoration of areas around the temporary facilities. The preliminary construction cost is estimated at $8,000,000 for FS 25, and $13,000,000 for FS 33. The total cost of construction is estimated to be $ 21,000,000. The APIs applicable to the construction phase(s) of this project, including any mandatory SBE or M/WBE goal(s) for the construction subcontracts, will be determined by the Countys Goal Setting Committee prior to subcontractor bidding for each Guaranteed Maximum Price Amendment. It is anticipated that at least a mandatory minimum SBE subcontracting goal of 20% will be applied to the construction phase(s) of this project. However, depending on the availability of S/M/WBEs at the time of subcontractor bidding, the Countys Goal Setting Committee may apply a higher mandatory SBE subcontracting goal or may apply a mandatory M/WBE subcontracting goal. Proposers should review the RFP for more information on the Countys EBO Program as it applies to the construction phase(s) of this project. At the time of proposal submission, respondent must be properly certified and licensed in the State of Florida and/or Palm Beach County, as applicable, for the purpose of performing the specified work. Palm Beach County reserves the right to waive any proposal irregularities, informalities, or technical deficiencies and to reject any and all proposals.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects