Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

October 31, 2024

No Information to Display

Grist Mill Dr

Site Work

No Information to Display

$353,000.00

Public - City

img_map_placeholder

Grist Mill Dr, Packer Township, PA

Our team is requesting plans for this project.

Subscribe to View Full Documents

The project includes the design and construction for replacement and retroit of existing storm sewer systems, roadside swales, and cross pipes at several locations along Grist Mill Drive. The work includes demolition, excavation & backill, grading, pipe, inlet, and endwall installation, erosion and sedimentation controls, as well as roadway trench and surface restorations. All materials must meet PennDOT Pub. 408 Speciications and Standards. Bidders do not need to be PennDOT prequaliied. Proposals must be delivered only by United States Postal Service to the Municipal Building at the above address unless prior arrangements are made with Stephanie Stolpe, Secretary, by calling 570-427-8969 for hand delivery. Proposals must be on forms provided by the Township and shall be marked 'Grist Mill Drive Storm Sewer Improvements'. All bids must be accompanied by a certiied check or Bid Bond in the amount equal to ten percent (10%) of the bid made payable to Packer Township. The successful bidder will be required to provide a Performance Bond and Payment Bond each in the amount of 100% of the contract price within twenty (20) days of the award of the Contract. The Packer Township Board of Supervisors reserve the right to accept or reject any and/or all proposals or portions thereof, and to delete projects and/or portions of the project depending on budgetary constraints and also to waive any technicalities deemed to be in the best interest of the Township.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.