Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 18, 2024

May 31, 2025

113 W North Water St

Demolition, Remodeling, Site Work

No Information to Display

$2,600,000.00

Public - City

img_map_placeholder

113 W North Water St, New London, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

Accepting separate sealed bid proposals for the following divisions of work: Demolition, Masonry, Carpentry, Insulation, Aluminum Storefronts and Windows, Rolling Counter Door, Plaster Board Assemblies, Cabinets & Millwork, Acoustical Panel Ceiling, Flooring, Painting & Finishing, Fire Protection, Plumbing, HVAC, Electrical / Low Voltage / Security and Communications, and Signage. In general the project consists of a 26,000 sq. ft. remodel of the previous First State Bank facility. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 10% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 30 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 30 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. Performance Bond: 100% of the Contract Price Required Payment Bond: 100% of the Contract Price Required. Bidders shall submit a Contractor Proof of Responsibility form provided in the specifications to City of New London. Submit form to: New London City Hall, Attn: LIBRARY BID; 215 N Shawano St, New London, WI 54961. Schedule: Project is anticipated to start in November of 2024 and be substantially complete by May 2025. The low responsive, responsible bidder will be recommended for contract award. Owner reserves the right to reject any or all bids, to waive technicalities in bid or to accept a bid which will be in the best interest of the Owner. Bids shall remain open to acceptance for a period of 60 days after bid due date.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.