Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 2, 2024

No Information to Display

US-13

Paving, Site Work

No Information to Display

$17,500,000.00

Public - State/Provincial

img_map_placeholder

US-13, Dover, DE

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

County : Kent County Project Description : This project provides a connection/extension of the proposed West Camden Bypass at the intersection with US13, it will then head northeast on a new alignment to a proposed roundabout on SR10. This proposed roundabout will provide access for the new roadway alignment, existing SR10 and existing Rising Sun Road. The new alignment will then continue northeast to the existing intersection of US13 & Old North Road. The new alignment will also provide connections to the local roadway network within the project limits, will meet local road design standards and will provide multi-modal accommodations. Project Justification : This project is part of the Camden Bypass Study that was adopted into the Town of Camden's Comprehensive Plan. The purpose of the project is to increase safety and reduce traffic congestion along SR10 through the Town of Camden and improve traffic operations at the US13/SR10 and US13/Old North Road intersections. The roadway and intersections currently have a failing level of service. These intersections are used by vehicles to access schools located on Old North Road. This additional congestion adds to the capacity issues and the higher than average crash rate on this section of US13. As of September 21, 2024, the project is in Final Planning status. Anticipated Construction year is 2024. DEDOT - East Camden Bypass *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.