Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 21, 2024

November 20, 2024

No Information to Display

Azalea St

New Construction, Site Work

No Information to Display

$1,400,000.00

Public - City

img_map_placeholder

Azalea St, Hinesville, GA

1

5

10

Subscribe to View Full Documents

The Contractor shall furnish the Owner with every reasonable facility for ascertain in whether or not the work performed and materials used are in accordance with the requirements and intent of the Specifications and Contract. No work shall be done or materials used without suitable supervision or inspection by the owner or his representative. Failure to reject any defective work or materials shall not in any way prevent later rejection when such defect is discovered, or obligate the Owner to final acceptance. All materials furnished and work done when not in accordance with the Specifications and Contract will be rejected and shall immediately be removed and other work done and materials furnished in accordance therewith. If the Contractor fails to remove the work and materials as above ordered, within forty-eight (48) hours, then the Owner or his representative shall have the right and authority to stop the Contractor and his work at once and to supply men and material at the cost and expense of the Contractor to remove said work and materials. Construct (7) single-family detached dwellings in Phase III(b) of the Azalea Street Redevelopment. The Contractor shall furnish and install all necessary temporary works for the protection of the work, including barricades, warning signs, and lights at night The Contractor shall be required to obtain applicable Building Permits and Business Licenses as required by the City of Hinesville, Georgia. Question Deadline 10/14/2024 at 12:00 PM ET Any substantive questions regarding this RFP should be submitted in writing to the Community Development Director, Mr. Ryan Arnold, at rarnold@cityofhinesville.org The necessary land for the construction of the work will be furnished by the Owner. The Contractor is directed to the Owner for right-of-way actually acquired. The Owner will provide no righ tof-way over other property. The contractor shall take every possible precaution to inconvenience as little as possible the owners and tenants of adjacent property. Public highways shall not be obstructed in such a way as to cut off traffic. The Contractor shall, at his own expense, repair any damage or injury to either public or private property during the progress of the work. Wholesale cutting of trees on the right-of-way will not be permitted except as necessary for construction.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.