Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

December 11, 2024

6900 Courthouse Rd

Renovation

No Information to Display

$434,210.00

Public - State/Provincial

img_map_placeholder

6900 Courthouse Rd, Chesterfield, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Summary: Clean all the HVAC systems in the main compound of Central Virginia Correctional Unit #13 located at 6900 Courthouse Road, Chesterfield, VA., 23832. The ducts in the main compound are located in the basement, first floor and on the roof. SCOPE OF WORK/DESCRIPTION OF ITEMS (SPECIFICATIONS) The Virginia Department of Corrections is seeking a DSBSD-certified vendor to clean all the HVAC systems in the main compound of Central Virginia Correctional Unit #13 located at 6900 Courthouse Road, Chesterfield, VA., 23832. The ducts in the main compound are located in the basement, first floor and on the roof. All components of the system to include, but not limited to: Fan Blower and housing Supply registers Return registers Supply Ducts Return Dust Condensate Drain Pan Drain Pail Access Door Panels Remove all supply and return register vents to clean and disinfect. The units should be fogged and disinfected included using a natural antimicrobial, disinfectant and deodorizing the work. Protect flooring and work areas while cleaning Replace all filters after cleaned Due to long runs of duct; access panels may need to be cut to facilitate the air duct cleaning process. If necessary, install access panels into duct Provide before and after photos of the cleaning. CLARIFICATION OF TERMS: If any prospective (bidder/offeror) has questions about the specifications or other solicitation documents, the prospective (bidder/offeror) should contact the buyer whose name appears on the face of the solicitation no later than five working days before the due date. Any revisions to the solicitation will be made only by addendum issued by the buyer.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects