Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

May 31, 2025

Multiple Locations

Site Work

No Information to Display

$70,000.00

Public - County

img_map_placeholder

Multiple Locations, Butte, NE

Our team is requesting plans for this project.

Subscribe to View Full Documents

The work shall include all labor, materials, transportation, and equipment required for the construction of: Site 2 Sta. 12+90.00 Install Triple 108" x 62' Culvert Pipe, Type 3,4 or 5, w/Prefabricated Headwalls on 30 Skew (RHB) Site 10 Sta. 17+62.20, 63.2' Lt. to Sta. 17+99.7, 36.6' Lt. Install Single, Single Broken Back 36" x 46' Culvert Pipe, Type 3, w/Flared End Section on Inlet Sta. 37+67.50 Install Triple, Double Broken Back 78" x 44' Culvert Pipe, Type 3,4 or 5 w/Prefabricated Headwalls Each bidder will be required to submit with his proposal a Bid Bond or Certified Check made payable, without condition, to the County Treasurer of Boyd County, Nebraska, in an amount equal to five (5) percent of their proposal. The bidder to whom the contract is awarded shall furnish within ten (10) days after the award a surety bond or bonds in a sum equal to the full amount of the contract. The form of the bonds and surety shall be acceptable to the Boyd County Board of Supervisors. The bidder will include an estimated time of beginning and completion for the project with the proposal. The Contractor will be allowed 21 calendar days on Site 2 and 45 calendar days on Site 10 for completion of the work. The required completion date of the project is May 31 ,2025. Please note that although there are two sites, this is considered to be one project and should be bid as such. The Boyd Board of County Supervisors reserves the right to reject any and all bids, to pass upon the regularity, and to waive any irregularities. The Boyd County Board of Supervisors will, at their discretion, award the contract based on the lowest or best bid. Boyd County is an Equal Opportunity Employer.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.