Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2024

December 16, 2024

May 12, 2025

123 International Boardwalk

Paving, Site Work

No Information to Display

$1,758,000.00

Public - City

img_map_placeholder

123 International Boardwalk, Redondo Beach, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Work consists of both general building and seismic repairs of the North Pier Parking Structure in the City of Redondo Beach, California. Project work shall include the following: Project comprises of the restoration of selected areas of the floors, ceilings, beams, columns, rails, curbs for North Pier Parking Structure located at Redondo Beach, California as identified in the Drawings. General building work consists of 2 supported levels and slab-on-grade and includes repair of select areas of the concrete slab, beams, columns, walls, epoxy injection, selected areas of guardrail replacement, traffic markings, etc. at locations within parking structure as shown in Drawings. Seismic work consists of new shear walls supported by micro pile foundations. Cord and drag steel will be added to the existing topping slabs. The existing waffle shear wall on grid line Z between the village and pier level will be strengthened as well as double tee stems in the vicinity. Work on basin level is to be prioritized with work on pier and village level bid as additive bid items. The seismic repairs shall be coordinated and performed concurrently with the general building repairs. Bidders shall have an active Class "A" or "B" license from the Contractor's State License Board, a minimum of 5 years of applicable experience and 5 recently completed similar public works projects, at the time of submitting bid. The project contract shall be completed and facility shall be made ready for service within 100 working days after the Notice to Proceed is issued. Contact project manager, Lauren Sablan, at 310-318-0661, or by email at lauren.sablan@redondo.org for questions regarding this project.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects