Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

December 10, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$4,600,000.00

Public - County

img_map_placeholder

Multiple Locations, S Zanesville, OH

Our team is requesting plans for this project.

Subscribe to View Full Documents

UNIT PRICE CONTRACT consisting of construction of approximately 26,515 linear feet of water main which includes 19,595 linear feet of 12- and 4-inch PVC and HDPE water main installed by open trench methods, and 6,920 linear feet of 12-inch HDPE water main installed by horizontal directional drilling, 17 gate valves, two master meter vaults, a water pumping station, tie-ins to the existing Muskingum County Water distribution systems, a tie-in to the existing Maysville water distribution system and other appurtenances necessary to complete the work. The Cost Estimate for Contract No. 1 is $ 4,600,000.00 Each Bidder must submit with his Bid, security in the amount, form and subject to the conditions provided in the Instruction for Bidders. All work done under this contract shall be subject to all Federal Davis Bacon Wage rates and rules. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each Bidder must submit evidence of its experiences on projects of similar size and complexity. All Contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, Contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. The Contractor shall not discriminate on the basis of race, color, national origin or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded under EPA financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach of this contract which may result in the termination of this contract or other legally available remedies. The Owner reserves the right to waive any informality or to reject any and all Bids.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects