Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

December 2, 2024

March 31, 2025

800 E 17th Ave

Renovation

No Information to Display

$460,000.00

Public - State/Provincial

img_map_placeholder

800 E 17th Ave, Columbus, OH

8

10

Subscribe to View Full Documents

The final date questions are due to the A/E (if you wish to guarantee answer in final Addendum) is: Friday October 18, 2024, at 12:00 Noon. The anticipated project cost is $460,000. A Bid Guaranty and Contract Bond are required as defined in the Contract Documents. Prevailing wage rates for Franklin County as determined by the State of Ohio, Department of Commerce, Division of Labor and Safety will be applicable to this Work. 1. The amount of the Certified Check, Cashierís Check or Letter of Credit shall be equal to ten percent (10%) of the base bid plus add alternates. The following is a general description of the Work involved in this Project and is not intended to comprise a complete description of all work required. 1. Demolition: a. Remove (2) existing diesel generators, including exhaust, fuel, and water piping. b. Remove (2) existing substation secondary low-voltage distribution sections. c. Remove existing abandoned cooling tower and foundations. d. Remove (2) existing 500-gallon underground fuel storage tanks, piping, fuel pumps, and fuel level gauges. e. Remove (2) existing surge protection devices. 2. New Work: a. Install new diesel emergency generator with sub-base fuel tank furnished by Owner. b. Install new substation secondary low-voltage distribution sections furnished by Owner. c. Install new distribution panels and associated surge protection devices furnished by Owner. d. Install new transfer switches furnished by Owner. e. Provide diesel fuel in sub-base fuel tank. f. Provide new generator reinforced concrete pad. g. Provide lighting fixture. h. Provide wiring devices. i. Provide all wiring and conduit. B. The entire project is required to be completed to accommodate Owner-occupied areas and ongoing operations. Contractors shall cooperate and assist with this requirement. Direct all questions and comments to the RDFA Project Manager: Mr. Jim Bentz V: (614) 451-2248 Email: jbentz@rdfa.com

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.