Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 30, 2024

March 3, 2025

December 31, 2029

Multiple Locations

Addition, Demolition, New Construction, Renovation, Site Work

No Information to Display

$61,072,833.00

Public - County

img_map_placeholder

Multiple Locations, Spartanburg, SC

Our team is requesting plans for this project.

Subscribe to View Full Documents

Expansion of the South Valley's Regional Park located at 16050 Wedge Parkway, Washoe County, Nevada. Work includes demolition and removal of existing facilities. Grading of the site per the plans and specifications. Placement and compaction of fill and aggregate base. Placement and compaction of asphaltic concrete for roadways and parking lots. Placement of Portland Cement Concrete for sidewalk, curb and gutter, valley gutters, median islands, etc. Installation of traffic control devices such as striping, signage, and speed tables. Installation of storm, sewer, and irrigation lines. Installation of lighting and electrical equipment. Installation of landscaping and irrigation controls. For a complete list of work see bid schedule. All work shall be per the plans and specifications. Question Deadline 10/10/2024 at 1:00 PM ET Anticipated date to provide answers October 14, 2024, 1:00 PM. BID BOND: Your offer must include either a bid bond issued by a surety, or sureties licensed in South Carolina or a certified check. The amount of surety shall be five percent (5%) of the total bid amount. This bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. If a certified check is submitted in lieu of a bid bond, it must be made payable to Spartanburg School District Seven. The Contractor agrees that it will before this Contract becomes effective, furnish the Owner a Faithful Performance Bond and a Labor and Material Payment Bond, furnished by a company or companies acceptable to the Owner, each in an amount equal to one hundred percent (100%) of the total Contract sum. Time of Completion The Work to be performed under this Agreement shall be completed within two hundred forty (240) calendar days of the "Notice to Proceed". Should the Contractor fail or refuse to complete the work within that time, along with any authorized extensions of time, there shall be deducted from monies due it, not as a penalty, but as liquidated damages, the sum of five hundred dollars ($500.00) for each additional calendar day required to complete the work. REJECTION/CANCELLATION: The Spartanburg School District Seven may cancel this solicitation in whole or in part. The Spartanburg School District Seven may reject any or all proposals in whole or in part. A minimum of three bids is desired. If less than three bids are received, Spartanburg School District Seven will make a determination.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects