Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 15, 2025

No Information to Display

CO-184 & Rd 25

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

CO-184 & Rd 25, Dolores, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Under contract to Montezuma County, prepare engineered design plans, specifications, and bid documents to Realign County Road 25: 1. Design a portion of Road 25 to realign with State Highway 184 at the Heritage Center access. 2.Design required turn, acceleration and deceleration lanes to meet CDOT Intersection Criteria. 3.Provide engineering for survey lay-out to relocate Road 25. 4. Follow Montezuma County Road Standards and CDOT Specifications. 5. Act as Project Management and CDOT Liaison for Montezuma County. During construction, County forces - staff and equipment - will be utilized to the fullest extent possible as determined by the County. The design will be completed to facilitate this goal. 1. Complete the design to the post-Final Office Review (post-FOR) level. Once construction funds are identified the Engineer will be contracted by Montezuma County to finalize the design; complete the Plans, Specifications, and Estimate (PSE) package for advertisement, provide design support and act as Project Management under construction. 2. Aid Montezuma County in development of an Independent Cost Estimate (ICE) for the project, to include labor, fees, material costs, equipment charges, and all other direct or indirect costs. The Montezuma County Board of County Commissioners reserves the right to waive any and all informalities or irregularities in the Request for Qualifications process, and the right to disregard all non-conforming, nonresponsive, or conditional proposals. The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.