Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2024

December 25, 2024

November 30, 2025

Multiple Locations

Site Work

No Information to Display

$9,149,000.00

Public - City

img_map_placeholder

Multiple Locations, Sacramento, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Project includes construction of the following items Construction of approximately 9,485 linear feet of 8-inch Vitrified Clay Pipe (VCP) by open cut Construction of approximately 55 linear feet of 21-inch RCP Class III or Vitrified Clay Jacking Pipe (VCP-J) casing by bore and jack. Construction of approximately 95 linear feet of 16-inch PS-115 ASTM F679 Polyvinyl Chloride (PVC) by open cut construction. Construction of approximately 13,475 linear feet of 4-inch and 6-inch High Density Polyethylene (HDPE) service laterals by open cut and/or Horizontal Directional Drill (HDD). Connecting approximately 114 service laterals to existing septic plumbing on private property, abandoning approximately 115 existing septic systems by removing cover, pumping dry, puncturing bottom, and filling void. Disconnect septic plumbing and leach lines and abandon in place. Sewer bypass system during construction and removal and site restoration following tie-ins. Award of this contract requires a valid California contractors Class A - General Engineering license. Any questions regarding the type of work to be done may be addressed to Ken Murray at (916) 875-1999 or septic@sacsewer.com. The bidder questions deadline is October 9, 2024 at 5:00 PM. a certified check or cashiers check payable to the Treasurer of Sacramento County, or cash from an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder must be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Sacramento Area Sewer District, each for not less than one hundred percent (100%) of the contract price. The successful bidder will achieve substantial completion of the Work in Linda Manor by September 30, 2025 and in Old Florin Town by November 30, 2025. The Board reserves the right to reject any or all bids, to waive any formality in any bid, and to determine which bid, in the judgment of the Board, is the lowest responsive bid of a responsible bidder.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects