Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

November 22, 2024

5466 Bridge St

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

5466 Bridge St, Roscoe, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe to View Full Documents

The Work of the Project is defined by the Contract Documents and consists of Site Work, Curb/Gutter and Asphalt for Parking, Canopy Structure, Electrical, Pedestrian Patio, Site furnishings, etc. SCOPE: Bids shall be submitted for a single contract for all Work. BID SECURITY: Bids shall be accompanied by a Bid Security of at least 5% of the total amount of the base bid and all additive alternate bids. This may be in the form of a certified check, cashier's check, bank draft, or bid bond, payable to the Owner as a guarantee that the bidder will enter into a contract with the Owner and will furnish the proper performance and payment bond within the time limited by the Owner. If the successful bidder so files the contract and performance and payment bond, upon the execution of the contract by the Owner, the Bid Security will be returned to all bidders. If he/she fails to file such contract and performance and payment bond the amount of the Bid Security will be forfeited to the Owner as liquidated damages. PERFORMANCE BOND: A performance and payment bond for the full amount of the Contract will be required of the successful bidder. All costs associated with the bond shall be included in the bid amount. RFI & CLARIFICATIONS RFI's are due to the Architect in writing, no later than 10:00 am, Thursday, September 26th, 2024. PRE-BID SITE VISIT: Contractors are required to survey the existing conditions prior to bidding. RIGHTS RESERVED BY OWNER: The Owner reserves the right to waive any irregularities and/or reject any or all bids when, in the opinion of the Owner, such action will serve the best interests of the Owner. WITHDRAWAL OF BIDS: No bid may be withdrawn for a period of sixty (60) days after the opening of bids without written consent of the Owner. TENTATIVE SCHEDULE Award of Contract: Tuesday - October 8th, 2024 Substantial Completion: Friday - November 22nd, 2024.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.