Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 10, 2025

No Information to Display

Multiple Locations

Site Work

No Information to Display

$760,000.00

Public - County

img_map_placeholder

Multiple Locations, Burlington, KY

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Boone County Fiscal Court is requesting proposals to provide professional engineering services for the design of waterline improvements associated with Engineering Services for Water Main Expansion, Boone County, Kentucky - Group 3.2. The design will include development of construction plans and documents required to complete the improvements with the goal of providing water availability and fire protection on unserved streets. This Request for Proposals is intended to identify an engineering partner to complete all facets of data collection, research, fieldwork and design services necessary to complete a final engineering plan set to be used for bidding the construction of the desired water main lines. The Boone County Fiscal Court has indicated its desire to pursue the further extension of public water service in currently unserved areas of the County. This builds upon past projects to extend water service throughout the County. Staff evaluated neighborhoods where public water mains are in close proximity to streets currently without public water service and prioritized streets to be initially considered for water main extension based upon density and proximity to an existing water main, as well as, available resources. Neighborhoods that were prioritized for the next phase were offered the opportunity to confirm their interest in the project through a commitment to utilize the new public water system. The County is funding the expansion project and will partner with the Boone County Water District, Bullock Pen Water District and City of Walton Water Department to plan, engineer, design, construct, and operate these new water main improvements. Question Submission Deadline:October 3, 2024, 5:00pm Question Response Deadline:October 8, 2024, 5:00pm

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.