Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

December 9, 2024

July 7, 2026

NJ-15

Demolition, New Construction, Paving, Site Work

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

NJ-15, Lafayette, NJ

119

3

4

Subscribe to View Full Documents

Route 15, Bridge over Paulins Kill, Contract No. 017093190, Bridge Replacement, Lafayette Township, Sussex County; Federal Project No: 0015(317), UPC No: 093190, PE No: 1922502, CE No: 1902509 Estimated Completion Date on 07/07/2026 Estimated Range between $2,500,001 to $5,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 4 or 5 The Principal Items of Work Consist of: Roadway Quantity Unit Description 3,252 Sy Hma Milling, 3" or Less 1,511 T Hot Mix Asphalt Various Thickness and Course Structure: Quantity Unit Description 1,400 Cy Excavation, Unclassified 325 Cy Concrete Footing 55 Lf Precast Concrete Culvert 85 Cy Concrete Bridge Deck, Hpc 1 Ls Temporary Structure, Two-way Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning The Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 145 - Bridge Replacement - Route 15 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.