Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2024

November 4, 2024

March 1, 2025

St Vrain Rd

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

St Vrain Rd, Allenspark, CO

79

4

2

Subscribe to View Full Documents

Reference Number 0000363546 Job Location: Town of Lyons The Town of Lyons applied for and received CDOT funding to design and construct a trail that is approximately 3/4 of a mile within Town Right of Way. The purpose of this multimodal trail is to support safety for pedestrians, bicyclists, golf carts and any other modes of transportation other than roadway vehicles. The St Vrain Trail Extension project will complete full trail connectivity from the west end of Lyons to the east end of Lyons. This work consists of constructing a 10' wide trail running generally East-West from McConnell Drive and US36 intersection to the US36 and SH66 junction. The West portion of the trail will be concrete, and the East half of the trail will be crusher fines. The trail includes three ditch crossings that will include one pedestrian bridge and two concrete box culverts crossings. Multiple types of fencing along half of the trail will be constructed. Question Deadline 10/07/2024 at 4:00 PM MT Questions are submitted online No All inquiries regarding this IFB shall be submitted via e-mail to JDoles@townoflyons.com and TSanders@townoflyons.com Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - Prevailing Wage Required - Training Required Bonding Requirements - Bid Bond 5 % - Performance Bond 5 % - Maintenance Bond 0.01 % - Surety Bond 0.01 % - Labor and Materials Bond 5 % - Payment Bond 5 % The DBE Goal = 12% for this project

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.