Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

November 15, 2024

MB-21

Site Work

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

MB-21, Shoal Lake, MB

12

8

Subscribe to View Full Documents

Removing and disposing of an existing timber structure and installing two (2) new corrugated steel pipe culverts at Bridge Site No. 904-00 off of Provincial Trunk Highway (PTH) 21, located 5.8km South of Provincial Trunk Highway (PTH) 45, in the Municipality of Yellowhead. Question Acceptance Deadline: 2024/10/01 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.