Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

May 31, 2025

Multiple Locations

Site Work

No Information to Display

$210,000.00

Public - County

img_map_placeholder

Multiple Locations, Canton, OH

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Total Engineer's Estimate for the project is: $175,000.00 (Base Bid) $210,000.00 (Including all Alternates) Upon receiving a responsible and responsive low bid, the County will proceed with Award of the Contract based off the Base Bid plus Alternate or any combination of Alternate, whichever the County deems most beneficial. A pre-bid conference will not be held by the Stark County Engineer's due to COVID-19. Construction work shall be subject to the prevailing wage rates established by the Ohio Department of Industrial Relations. Each bid shall be in conformity with the Ohio Revised Code and all bids and certificates shall be upon the forms furnished with the specifications. All bids shall be delivered to the office of the Stark County Commissioners, at or prior to the date and hour specified for receiving bids. In the case of corporations not chartered in the State of Ohio, the bid shall be accompanied by a proper certificate of the Secretary of State, certifying that such corporation is authorized to do business in Ohio. Each bid shall be accompanied by a bid guaranty in the form of (1) a certified check, or cashier's check, or letter of credit equal to ten percent (10%) of the bid; or (2) a bid guaranty bond for the full amount of the bid; both forms of guaranties as provided in Chapter 153 of the Ohio Revised Code and in the project specifications. The amount of the bid for said guaranty purposes shall include all additive alternates. All bid guaranties shall be conditioned that if the bid is accepted within sixty (60) days of the bid opening, a proper contract shall be executed and that upon failure or refusal to enter into said contract within ten (10) days after receipt of notification of award, the bidder and the surety on any bond shall be liable to the County in an amount not to exceed ten (10) percent of the bid. Bidders shall comply with the Affirmative Action-Equal Employment Opportunity requirements set forth in the specifications. A Bidder/Contractor will be deemed committed to the goal of such bid conditions by submitting a properly signed bid. Each bidder must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex, handicap or national origin. Terms of payment shall be as provided in Chapter 153 of the Ohio Revised Code. The Stark County Commissioners reserve the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept any bid or combination of bids which is deemed most favorable to the County at the time and under the conditions stipulated. The commissioners further declare that they will award the contract for this project to the lowest and best bid, which may not necessarily be the lowest bid. The Specifications contain a Bidder's Profile and Best Bid Criteria designed to gather certain information that may be considered in this regard. No single factor will control the Board's decision to award, and the Board reserves the right to exercise its full discretion. No work may commence on this project until receipt by the contractor of a formal notice to proceed from the County Commissioners. ***Document Note: Reproduction cost is non-refundable and is the responsibility of the bidder. Bidding Documents can be forwarded upon request and a fee will be required; forwarding via the least expensive carrier. Only bidders of record will receive addendum to the specification, if any. The County nor AA Blueprint is not responsible if bidding documents so mailed are received too late for filing a timely bid. The only bids that will be accepted will be those of bidders of record. Bidders of record are those who have signed the bidders list, obtained specifications and paid the prescribed fee.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.