Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 21, 2025

No Information to Display

Secondary Highway 324

Paving, Site Work

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

Secondary Highway 324, Grant, MT

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Southwest of Grant-Southwest The SINGLE POINT OF CONTACT, including Q&A is Kelly Williams who can be reached at (406) 444-7961 or kwilliams@mt.gov Project design work will include all activities necessary to complete a capital construction project on Secondary 324 (S-324) from RP 21.9 to 34.4. The paved portion of the road from RP 21.9 to approximately RP 28.0 will be widened and overlaid. The gravel portion of the road from approximately RP 28.0 to RP 34.4 will be reconstructed to a 24-foot paved surface. Design activities will include, but not be limited to; survey, road design; geotechnical and surfacing investigations and analysis; hydraulics analysis and design; traffic and safety assessments and design; investigation of the existing right-of-way and assessment of proposed right-of-way needs; right-of-way design; potential right-of-way acquisition; utility and railroad coordination; environmental analysis and document, permitting; public involvement; plans and specification through final PS&E; answering questions posed during the letting Q&A process; and answering questions during the construction phase (CN). By submitting a proposal, it is understood your firm has capacity to complete the work requested in a timely manner (in accordance with the negotiated schedule) and that you have an internal quality assurance/quality control process achieving industry standard expectations for quality. The project is located on Secondary Highway 324 (S-324) between RP 21.9 and 34.4 southwest of the town of Grant, Montana. The project ends at the Montana - Idaho border (RP 34.4). The method of Contractor Selection has not been Determined at this time.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects