Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

October 17, 2024

October 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

Multiple Locations, Darby, PA

Our team is requesting plans for this project.

Subscribe to View Full Documents

The scope of work includes but is not limited to, 1 1/2 " milling and resurfacing of Branford Avenue and the 200 block S. 5th St., including incidental base repair. Optional items include curb cut ramps and crosswalk striping. A certifed check or bid bond shall be included with the bid for 10% of the bid total. Performance and Payment bonds in the amount of 100% of the contract price shall be required as work is identifed. Prevailing wages will not apply as the project value is <$100,000. The Borough Council reserve the right to reject any bid and to award the contract to the lowest responsible bidder(s) whose services are judged to best meet the interest of the Borough. The Borough reserves the right to waive any informalities or minor irregularities during evaluation of the bids.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.