Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 31, 2025

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Newton, MS

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Scope of Work Includes, but is Not Limited to, the Following: 1) Prepare Preliminary Cost Estimate, Plans and Specifications; 2) Distribute Bid Documents; 3) Assist in Bid Opening and Prepare Bid Tabulation; 4) Assist in the Execution of Construction Contracts; 5) Hold Pre-construction Conference; and 6) Perform Construction Inspection Including Periodic Reports to the Owner and Approve All Payment Requests. The Owner is an Equal Opportunity Employer. The Owner Encourages Minority-owned Business Enterprises (Mbes) and Women-owned Business Enterprises (Wbes) to Submit Proposals. All Proposals Must Be Submitted in a Sealed Envelope and Marked With the Following Language: "proposal for Engineering Services." Proposals Will Be Evaluated on the Following Factors: Qualifications (40 Points), Experience (40 Points), and Project Knowledge (20 Points).to Be Evaluated Properly, the Following Must Be Addressed in Detail: o Qualifications -the Qualifications of the Firm and Persons Assigned to the Project; o Experience - the Firm's Experience and the Projects Previously Undertaken, the Project Activities, and the Status of the Projects The Owner Will Designate a Selection Committee to Evaluate Each Proposal. The Selection Committee May Hold Proposals for a Period to Not Exceed Thirty (30) Days for the Purpose of Reviewing the Content of the Proposals and Investigating the Qualifications of the Firms and Assigned Individuals. the Owner Reserves the Right to Reject Any and/or All Proposals. The Owner Will Award a Contract With the Qualified Individual or Firm Whose Proposal Has the Highest Number of Cumulative Points Issued by the Selection Committee and Determined to Be the Most Advantageous to the Owner, Price and Other Factors Considered. The Contract Will Include the Scope and Extent of Work and Other Essential Requirements. The Contract Will Be on a Fixed Price Basis. The Owner Has the Authority to Terminate the Selection at Any Time.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.