Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

November 22, 2024

No Information to Display

240 S Water St

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

240 S Water St, Henderson, NV

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The City of Henderson, Nevada, (City) is seeking Proposals from qualified companies (Proposer) to furnish, install, maintain and operate up to eighteen (18) new/unused alternating current (AC) level 2 dual port electric vehicle (EV) charging stations at various City locations. The purpose of this RFP is to contract with a qualified electric vehicle charging station distributor/operator/manufacturer for the furnishing, installation, operation, and maintenance of Alternating Current (AC) Level 2 dual port electric vehicle charging stations for City fleet vehicles and public use at various locations within the City, as shown in Exhibit A, Installation Locations. The successful Proposer will be required to implement a program for the following situations: A. Allow all City fleet vehicles to utilize AC Level 2 dual port electric vehicle charging stations. Services would be provided on a 24-hour, 365-day-a-year (full-time) basis with sufficient resources and personnel to successfully support and maintain the program. B. Allow the public to utilize AC Level 2 dual port electric vehicle charging stations. Services would be provided on a 24-hour, 365-day-a-year (full-time) basis with sufficient resources and personnel to successfully support and maintain the program. Question Deadline: 10/15/2024 12:00 PM (PT

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.