Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 4, 2024

No Information to Display

63 Buckmasters Cir

Asbestos Abatement, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

63 Buckmasters Cir, St. John's, NL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe to View Full Documents

Closing Time: 10:00 AM (NT) Question Acceptance Deadline 2024/10/01 03:00:00 PM NDT 1 Provide all labour, materials, equipment, superintendence, temporary facilities and administration necessary to perform the Work outlined below and described in greater detail in this specification. 2 All work in this project is to be completed in accordance with all related NL Housing specifications and Occupational Health and Safety requirements. If you require a copy of our specifications please contact the NL Housing representative. 3 Contractor is responsible to verify all measurements on site prior to work being completed. The NL Housing representative is to be contacted with any discrepancies prior to proceeding with the Work. Project Description 1 Work for this project includes but is not limited to the stripping of damaged material of 63 Buckmasters Circle St. John's. Work for this project is as specified herein and referred to in the specifications. 2 The following outline is general and is not to be considered complete in every detail. All items to be supply and install unless otherwise noted. Contractor responsible for damage caused during construction. Before submitting a quote, bidders shall carefully examine the Contract Documents and the site of the proposed work to fully inform themselves of the existing conditions and limitations. No claim will be entertained or allowed for any labour, materials or other extras that may be required for the proper execution and completion of the contract, which could have been determined by site examination. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects