Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 17, 2024
November 18, 2024
April 1, 2025
1301 2nd Ave S
Renovation
No Information to Display
$200,000.00
Public - City
1301 2nd Ave S, Minneapolis, MN
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
MCC Hall E Cooling Coil Replacement Project - The City of Minneapolisisissuing this Call for Bidsfor prospective suppliersto provide all materials, labor, equipment and incidentals necessary for MCC Hall E Cooling Coil Replacement Project for CONVENTION CENTER, Substantial Project Completion: April 1, 2025 4% Combined MBE and WBE ; 20% Female and 32% Minority Questions due by: 12:00 PM on 10/08/2024 A. The work in this contract comprises of supplying and installing new heavy gauge copper cooling coils (Note: Minimum tube wall thickness shall be .017", not to exceed .022") in the listed HVAC units at the MCC. The vendor shall provide all tools and equipment to perform the installation of appropriately sized cooling coils in each specified HVAC unit. All work associated with the installation shall be performed by the vendor including, but not limited to, pipe fitting, plumbing, sheet metal and fabrication. The bid shall include any crane/rigging services to properly locate the materials for installation at the MCC. The bid shall include any modifications/preparations in the penthouse areas for the installation. This work will also include placing the old coils on the ground in an area specified by the MCC. Low voltage work will be performed by owner. All work shall be complete by April 1, 2025. B. Coordination of all work performed with MCC Project Manager. C. Required permits for Crane use and work performed shall be obtained by the successful bidder. D. Vendor shall perform all necessary connections to existing MCC equipment. E. Start and test unit for proper operation. F. Report any findings or deficiencies to client. G. Complete clean up by contractor after work complete. HVAC units covered in this scope are: Phase 1 AHU's: #1 Coil #3 Coil #5 Coil #6 Coil #7 Coil #8 Coil
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Minneapolis, MN
Bid Date: Oct 08 2024
Minneapolis, MN
Bid Date: Oct 08 2024
Minneapolis, MN
Bid Date: Oct 08 2024
Minneapolis, MN
Bid Date: Sep 10 2024
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Jun 07 2024
Minneapolis, MN
Bid Date: Dec 28 2021
Minneapolis, MN
Bid Date: Sep 20 2024
Minneapolis, MN
Bid Date: Oct 03 2024
Minneapolis, MN
Bid Date: Jul 25 2024
Minneapolis, MN
Bid Date: Aug 15 2024
Minneapolis, MN
Bid Date: Oct 17 2024
Minneapolis, MN
Bid Date: Sep 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
