Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

April 1, 2025

1301 2nd Ave S

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

1301 2nd Ave S, Minneapolis, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

MCC Hall E Cooling Coil Replacement Project - The City of Minneapolisisissuing this Call for Bidsfor prospective suppliersto provide all materials, labor, equipment and incidentals necessary for MCC Hall E Cooling Coil Replacement Project for CONVENTION CENTER, Substantial Project Completion: April 1, 2025 4% Combined MBE and WBE ; 20% Female and 32% Minority Questions due by: 12:00 PM on 10/08/2024 A. The work in this contract comprises of supplying and installing new heavy gauge copper cooling coils (Note: Minimum tube wall thickness shall be .017", not to exceed .022") in the listed HVAC units at the MCC. The vendor shall provide all tools and equipment to perform the installation of appropriately sized cooling coils in each specified HVAC unit. All work associated with the installation shall be performed by the vendor including, but not limited to, pipe fitting, plumbing, sheet metal and fabrication. The bid shall include any crane/rigging services to properly locate the materials for installation at the MCC. The bid shall include any modifications/preparations in the penthouse areas for the installation. This work will also include placing the old coils on the ground in an area specified by the MCC. Low voltage work will be performed by owner. All work shall be complete by April 1, 2025. B. Coordination of all work performed with MCC Project Manager. C. Required permits for Crane use and work performed shall be obtained by the successful bidder. D. Vendor shall perform all necessary connections to existing MCC equipment. E. Start and test unit for proper operation. F. Report any findings or deficiencies to client. G. Complete clean up by contractor after work complete. HVAC units covered in this scope are: Phase 1 AHU's: #1 Coil #3 Coil #5 Coil #6 Coil #7 Coil #8 Coil

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.